SOS Engineering Co logoSOS Engineering

On site and workshop line boring

Line boring in Rochester

Rochester is one of the closest runs we do, about 25 minutes straight down the Northern Highway. Worn pins and oval bores get welded up and machined true right where the machine sits, without floating it anywhere.

Excavator pivot housing line bored back to a true, round bore at the SOS Engineering workshop near Echuca
  • Mobile set-up

    We come to the machine

  • Workshop

    Fully set up at Wharparilla

  • Breakdowns

    Callouts by arrangement

Rochester VIC

What we see around Rochester

Rochester is about 25 minutes from the workshop down the Northern Highway, which makes it one of the quickest calls we get to. Most of what we see around town is dairy and cropping gear: loader linkages gone sloppy, three point pins worn oval, and silage and hay equipment that does a lot of hours in a very short window.

Irrigation country puts its own load through a machine. Excavators working channel banks, drains and outfalls around the Campaspe sit in wet grit all day, and grit in a joint is what turns a round bore into an egg. Bucket ears and boom pivots on those machines wear noticeably faster than the same machine on dry ground.

Being this close means a breakdown does not have to cost you a week. Tell us the machine and which pins are worn and we will give you a straight answer on whether it is a same day job on site or whether the component is better brought into the Wharparilla workshop.

~30km from the workshop

About 25 minutes, straight down the Northern Highway

What we get called to

Front end loaders and tractors, three point linkages, excavators on channel and drainage work, silage and hay gear, plus general farm and irrigation plant.

Local industries we work with

  • Dairy
  • Irrigated cropping
  • Broadacre
  • Vegetable growing

What line boring actually does

Every pivot on a machine wears. Grease breaks down, dirt gets in, and the pin starts working the hole. What began as a round bore slowly goes oval, the pin loses its fit, and the play works its way through the whole linkage.

Line boring fixes that in place. A boring bar is set up through the worn hole and aligned to the original centreline, the bore is built back up with weld, then machined true to size so a standard bush and pin drops straight back in. The machine usually needs pulling down to get to the pivot. We can do that for you, or you can have it stripped and ready before we arrive.

Left too long, that play stops being a bore problem. It cracks weld seams, elongates the housing past repair and puts load through things that were never meant to carry it. Caught early, it is a day of work. Caught late, it is a new component.

The short version: if you can rock the attachment by hand and feel movement in the joint, the bore has worn and it is worth a look before it costs you a component.

Signs you need line boring

  • Slop or knocking through the linkage under load
  • Bucket or blade wandering off line
  • Pin holes gone oval or egg-shaped
  • Pins spinning or seizing in the bore
  • Grease weeping straight back out of the joint
  • Cracked or dished bush housings

Spotted one or more of these? Give Sean a call and describe what the machine is doing. You will get a straight answer on whether it needs boring now or can wait.

What we line bore

Twenty years across mining, agricultural, civil and factory work. If it pivots and it has worn, there is a good chance we have bored one before.

Excavators & dozers

  • Boom and stick pivots
  • Bucket ears and links
  • Blade and C-frame pins
  • Ripper and hitch bores

Loaders & trucks

  • Loader linkage and bucket pins
  • Articulation joints
  • Tipper body hinges
  • Suspension and spring eyes

Agricultural gear

  • Front end loader arms
  • Three point linkage
  • Header and harvester pivots
  • Trailer and hitch points

Fixed plant

  • Crusher and screen pivots
  • Conveyor bearing housings
  • Press and baler linkages
  • Gate and chute hinges

How a line boring job runs

No mystery and no runaround. Here is exactly what happens from the phone call to the machine going back to work.

    You call, we talk it through

    Tell us the machine and which pivots feel worn. We work out whether it is an on site job or one for the workshop, and what it will take.

    We come to you

    The mobile set-up carries the boring bar, welder and power. Farm, pit, yard or factory floor, the machine stays where it is.

    Strip and measure

    Pins and old bushes come out, the bore gets measured, and we confirm how far it has worn before anything is cut.

    Weld and bore true

    The bore is built back up with weld, then the bar is aligned to the original centreline and the hole is machined round and back to size.

    New bushes and pins

    Fresh bushes pressed in and pins fitted, so the joint sits tight the way it did when the machine was new.

    Checked before we leave

    Measured against spec, moved through its range and greased up. You see it working before we pack up.

Why owners keep calling us back

No fuss, no runaround. Just honest work that holds up and gets your machine back to earning.

Quality of workmanship

Every repair is done properly the first time. Bored true, welded clean, measured and checked before it leaves.

Care for safety and equipment

Your machine gets treated like ours. Safe practice on site and respect for the gear we work on.

Reliability

When we say we will be there, we are. Straight answers, on time, and a fix that holds up.

Sean O'Sullivan, owner of SOS Engineering Co
20years in
the trade

My promise to you

G'day, I'm Sean. After 20 years in the trade, I decided to open SOS Engineering. That is two decades across mining, agricultural, civil and factory work, so there is not much machinery I have not had my hands on.

When you call, you deal with me. Whether it is a breakdown that cannot wait or a scheduled service to catch the small stuff early, you will get a straight answer, honest work, and a fix that holds up.

That is the deal: I look after your gear like it is my own, and I keep you moving.

Great service, keeping you moving.

Sean O'Sullivan

Line boring around Rochester

Rochester is about 25 minutes from the Echuca base, so it is one of the shortest runs we do and often the quickest to get onto. Elmore, Lockington, Nanneella, Timmering and the farms in between are covered on the same trip. The boring bar comes to the machine, or bring the component into the Wharparilla workshop if that is easier.

Rochester

Regular run

~300km

Service radius

Line boring FAQs for Rochester

About 25 minutes straight down the Northern Highway from Wharparilla, just south of Echuca. It is one of the closest towns we cover, so Rochester jobs are usually among the quickest we can get onto, breakdowns included.

Line boring in other towns we cover

The mobile set-up runs right across northern Victoria and the southern New South Wales side. If your town is not listed, call anyway and we will sort it.

Got a machine down? Let's get you moving

Call Sean with a quick rundown of the job and the machine. Straight answer, no runaround, on site or in the shop.