SOS Engineering Co logoSOS Engineering

On site and workshop line boring

Line boring in Swan Hill

Swan Hill is a longer run at around two hours up the Murray Valley Highway, and we still make it. Tell us what is worn and we will plan the trip properly, bore it true on site, and get the machine back into the row or the paddock.

Excavator pivot housing line bored back to a true, round bore at the SOS Engineering workshop near Echuca
  • Mobile set-up

    We come to the machine

  • Workshop

    Fully set up at Wharparilla

  • Breakdowns

    Callouts by arrangement

Swan Hill VIC

What we see around Swan Hill

Swan Hill is the far end of our normal travel, roughly two hours northwest through Kerang. That distance changes how the job gets run rather than whether it happens. We plan the trip, bring everything we could need, and where there is more than one worn pivot on the property we do them in the one visit instead of coming back twice.

Horticulture country puts a particular kind of wear through machinery. Telehandlers and loaders working almonds, citrus and table grapes do thousands of short lift cycles a season, and it is the constant load reversal that works the pins in the boom and carriage pivots. Orchard tractors, elevators and bin tippers wear the same way.

It is worth calling early out here. A pivot that is only starting to knock is a day of boring and new bushes. Left until the housing has elongated past repair, it becomes a new component plus freight, which is the expensive way to find out.

~155km from the workshop

Around two hours, up the Murray Valley Highway through Kerang

What we get called to

Telehandlers and orchard loaders, bin tippers and elevators, tractors, harvesters, excavators on irrigation and earthworks, plus packing shed plant.

Local industries we work with

  • Almonds and horticulture
  • Citrus and table grapes
  • Broadacre cropping
  • Packing sheds

What line boring actually does

Every pivot on a machine wears. Grease breaks down, dirt gets in, and the pin starts working the hole. What began as a round bore slowly goes oval, the pin loses its fit, and the play works its way through the whole linkage.

Line boring fixes that in place. A boring bar is set up through the worn hole and aligned to the original centreline, the bore is built back up with weld, then machined true to size so a standard bush and pin drops straight back in. The machine usually needs pulling down to get to the pivot. We can do that for you, or you can have it stripped and ready before we arrive.

Left too long, that play stops being a bore problem. It cracks weld seams, elongates the housing past repair and puts load through things that were never meant to carry it. Caught early, it is a day of work. Caught late, it is a new component.

The short version: if you can rock the attachment by hand and feel movement in the joint, the bore has worn and it is worth a look before it costs you a component.

Signs you need line boring

  • Slop or knocking through the linkage under load
  • Bucket or blade wandering off line
  • Pin holes gone oval or egg-shaped
  • Pins spinning or seizing in the bore
  • Grease weeping straight back out of the joint
  • Cracked or dished bush housings

Spotted one or more of these? Give Sean a call and describe what the machine is doing. You will get a straight answer on whether it needs boring now or can wait.

What we line bore

Twenty years across mining, agricultural, civil and factory work. If it pivots and it has worn, there is a good chance we have bored one before.

Excavators & dozers

  • Boom and stick pivots
  • Bucket ears and links
  • Blade and C-frame pins
  • Ripper and hitch bores

Loaders & trucks

  • Loader linkage and bucket pins
  • Articulation joints
  • Tipper body hinges
  • Suspension and spring eyes

Agricultural gear

  • Front end loader arms
  • Three point linkage
  • Header and harvester pivots
  • Trailer and hitch points

Fixed plant

  • Crusher and screen pivots
  • Conveyor bearing housings
  • Press and baler linkages
  • Gate and chute hinges

How a line boring job runs

No mystery and no runaround. Here is exactly what happens from the phone call to the machine going back to work.

    You call, we talk it through

    Tell us the machine and which pivots feel worn. We work out whether it is an on site job or one for the workshop, and what it will take.

    We come to you

    The mobile set-up carries the boring bar, welder and power. Farm, pit, yard or factory floor, the machine stays where it is.

    Strip and measure

    Pins and old bushes come out, the bore gets measured, and we confirm how far it has worn before anything is cut.

    Weld and bore true

    The bore is built back up with weld, then the bar is aligned to the original centreline and the hole is machined round and back to size.

    New bushes and pins

    Fresh bushes pressed in and pins fitted, so the joint sits tight the way it did when the machine was new.

    Checked before we leave

    Measured against spec, moved through its range and greased up. You see it working before we pack up.

Why owners keep calling us back

No fuss, no runaround. Just honest work that holds up and gets your machine back to earning.

Quality of workmanship

Every repair is done properly the first time. Bored true, welded clean, measured and checked before it leaves.

Care for safety and equipment

Your machine gets treated like ours. Safe practice on site and respect for the gear we work on.

Reliability

When we say we will be there, we are. Straight answers, on time, and a fix that holds up.

Sean O'Sullivan, owner of SOS Engineering Co
20years in
the trade

My promise to you

G'day, I'm Sean. After 20 years in the trade, I decided to open SOS Engineering. That is two decades across mining, agricultural, civil and factory work, so there is not much machinery I have not had my hands on.

When you call, you deal with me. Whether it is a breakdown that cannot wait or a scheduled service to catch the small stuff early, you will get a straight answer, honest work, and a fix that holds up.

That is the deal: I look after your gear like it is my own, and I keep you moving.

Great service, keeping you moving.

Sean O'Sullivan

Line boring around Swan Hill and the Mallee

Swan Hill sits at the outer edge of the roughly 300km we cover from the Echuca base, and the towns on the way up are all part of the same run. Kerang, Lake Boga, Nyah, Woorinen and the surrounding blocks are covered on the same trip. If you have more than one machine needing attention, line them up and we will sort them in the one visit.

Swan Hill

Regular run

~300km

Service radius

Line boring FAQs for Swan Hill

We do. Swan Hill is around two hours from the Wharparilla workshop, up the Murray Valley Highway through Kerang, and it sits inside the roughly 300km we cover. On a run that length we plan the job properly beforehand, so tell us what is worn when you call and we will bring everything needed to finish it in the one visit.

Line boring in other towns we cover

The mobile set-up runs right across northern Victoria and the southern New South Wales side. If your town is not listed, call anyway and we will sort it.

Got a machine down? Let's get you moving

Call Sean with a quick rundown of the job and the machine. Straight answer, no runaround, on site or in the shop.